The Integration Group for the Safety Case (IGSC) of the Nuclear Energy Agency (NEA) is co-sponsoring a project with the European Commission to develop a greater understanding of how to achieve the necessary integration for successful design, construction, testing, modelling and performance assessment of engineered barrier systems (EBS). These proceedings include the main findings and presented papers from the second workshop of the EC-NEA EBS project, which covered inter alia research and development work on pre- and post-closure processes; thermal management; thermal, hydraulic, mechanical and chemical process models; and repository design. The workshop was hosted by the US Department of Energy in Las Vegas, USA, on 14-17 September 2004.
Engineered Barrier Systems (EBS) in the Context of the Entire Safety Case
Workshop Proceedings, Las Vegas, USA, 14-17 September 2004
Report
Share
Facebook
Twitter
LinkedIn
Abstract
In the same series
-
8 January 2021112 Pages -
Report
Final Methodology
7 January 202192 Pages -
17 August 202051 Pages
-
24 March 2020182 Pages
Related publications
-
Report
Validation of Beginning-of‑Life Power Ramping (Case 3)
30 April 202468 Pages -
Report
Hypothetical Beginning-of‑Life Power Ramps (Cases 1 and 2)
30 April 202492 Pages -
Report
A Temperature Analysis Benchmark
31 October 2023123 Pages -
Report
Advances in the Analysis and Management of Accidents and Future Challenges
26 October 202340 Pages -
22 September 2023435 Pages