The nuclear sector has in recent years been placing increasing attention on the need to better understand variations between cost estimates for the decommissioning of nuclear power plants, as well as the relationship between estimated and actual costs, and the apparent escalation of these costs. Building on previous work by the Nuclear Energy Agency, Cost Benchmarking for Nuclear Power Plant Decommissioning examines approaches and methods for the benchmarking of nuclear power plant decommissioning costs. Particular focus is given to identifying key factors, drivers and constraints to implementing cost benchmarking. These factors are addressed from a broad range of perspectives in order to develop a roadmap for implementation that will garner sufficiently broad support from a wide base of interested stakeholders. The report also identifies a number of perceived barriers that may impede the implementation of benchmarking for decommissioning. Co-ordinated efforts and further analysis will be needed to help remove these barriers.
Share
Facebook
Twitter
LinkedIn
Abstract
In the same series
-
8 January 2021112 Pages -
Report
Final Methodology
7 January 202192 Pages -
17 August 202051 Pages
-
24 March 2020182 Pages
Related publications
-
Report
Validation of Beginning-of‑Life Power Ramping (Case 3)
30 April 202468 Pages -
Report
Hypothetical Beginning-of‑Life Power Ramps (Cases 1 and 2)
30 April 202492 Pages -
Report
A Temperature Analysis Benchmark
31 October 2023123 Pages -
Report
Advances in the Analysis and Management of Accidents and Future Challenges
26 October 202340 Pages -
22 September 2023435 Pages