While refurbishments for the long-term operation of nuclear power plants and for the lifetime extension of such plants have been widely pursued in recent years, the number of plants to be decommissioned is nonetheless expected to increase in future, particularly in the United States and Europe. It is thus important to understand the costs of decommissioning so as to develop coherent and cost-effective strategies, realistic cost estimates based on decommissioning plans from the outset of operations and mechanisms to ensure that future decommissioning expenses can be adequately covered.
This study presents the results of an NEA review of the costs of decommissioning nuclear power plants and of overall funding practices adopted across NEA member countries. The study is based on the results of this NEA questionnaire, on actual decommissioning costs or estimates, and on plans for the establishment and management of decommissioning funds. Case studies are included to provide insight into decommissioning practices in a number of countries.
Share
Facebook
Twitter
LinkedIn
Abstract
In the same series
-
1 December 202153 Pages
-
29 July 2021155 Pages -
Report7 July 2021239 Pages
Related publications
-
Report
Validation of Beginning-of‑Life Power Ramping (Case 3)
30 April 202468 Pages -
Report
Hypothetical Beginning-of‑Life Power Ramps (Cases 1 and 2)
30 April 202492 Pages -
Report
A Temperature Analysis Benchmark
31 October 2023123 Pages -
Report
Advances in the Analysis and Management of Accidents and Future Challenges
26 October 202340 Pages -
22 September 2023435 Pages